Hello from the “off the grid” New Hampshire! As some of you know, I often get away to my cabin here, where it is, to put it mildly, rustic. Well, it’s always something. Now the folks here say they can’t give me a license plate without a “911 address.” That takes 5 weeks. That means my car (with expired Kentucky tags) is illegal to drive, which means I can’t keep its battery well charged, (I have no AC on site) which means everything that runs AC or is rechargeable has to be kept to an absolute minimum. I am building a garage, you see, near the road, which will provide a gateway for such utilities. If you can call it a garage… Actually it is an experimental structure, sort of a pregnant “A-frame” with a curved roof. It relies on the strength of curves and of laminations, and can be built single-handedly, even by a 56 year old. (me) It should cost less than half of a traditional structure. Anyway, the point is that the computer I am writing this on is one such energy drain, and is competing with my rechargeable tools. So I might not be around a lot, blog-wise. I am currently at the library, but that an option best suited for rainy days, and it is beautiful outside today.
Now on to some thoughts on PRT. The real obstacle to PRT is, and has always been, the business model. Without a lot of political will, it is hard to get the government funds needed, and that political will cannot exist while there is fear, uncertainty and doubt. Two “Fortune 500” companies have abandoned PRT after sinking millions into it for that very reason.
It is not the track or the stations, for steel companies and builders would love the contracts. After all, they will get paid regardless. Vehicle builders would love it too, although they have a bigger, longer lasting stake. But building vehicles (warranties included) is what they do. Everybody, so far, is within their core competencies, and structuring a deal would be similar to what they do every day.
Not so control. This is a little manufacturing, a little maintenance, a long-term service…
Business-wise, it’s a real mess. PRT companies can stand up bravely all day long and explain how they will always be there, but no one is going to listen. Bankruptcies are just part of the game these days, and all that leaves a city with is a bunch of useless hardware.
It stands to reason then, that the matter should be attacked directly. What can be done to get a handle on this “vendor-dependency issue? What I have endeavored to do, as a first step, is to make the problem smaller. In my last post, I detailed a time-based control system that could reside largely in cyberspace. It could be hosted by almost anybody. It could handle most traffic management and fare collection, things that are not affected by the inherent latency of the internet. On the other end, I have strived to give more control to the vehicles themselves. After all, not bumping into each other seems like a task well suited for those vehicles directly involved.
I do not claim that a global internet-based traffic management system along with autonomous cars is all that is required. As traffic density increases, the ability of vehicles to act with any kind of autonomy will all but vanish, just as it does in auto traffic. The combination I have described is inadequate for the job of high speed, high density, minimal headway traffic. But this does not change the fact that predicating a control architecture on the health of an untested company is a serious, probably fatal, drawback. At least with the combination I suggest, if the PRT company goes under and no longer provides any parts, training or support, the system would still work. Just not optimally. This would give the city some breathing room while they search for a fix. After all, the problem with PRT companies is that they are irreplaceable.
So, to recap, my objective is to structure a PRT construction and control architecture that cannot leave a city stranded, or come as close to that objective as possible. This may not make for the prettiest software code or networking structure, but it is, in my view, the only way forward. At the very least, we should all be looking at exactly what can be done to structure the control aspect of PRT into simple, definable businesses with ordinary equipment requiring minimal special training. What equipment, where? How many people? Is there scheduled maintenance? Replacement? What communications gear does the track need? Who will install that? You get the point. If we can divide and conquer this stuff, we will be a long way ahead.
Showing posts with label "Personal Rapid Transit" "Personal Automated Transit". Show all posts
Showing posts with label "Personal Rapid Transit" "Personal Automated Transit". Show all posts
Saturday, September 11, 2010
Sunday, December 6, 2009
62 > Mission and Miscellanea
First on the agenda, readers may note that our “Recent Comments” feature has disappeared. It was rather peculiar. I was on the phone with someone asking if it was just my machine, which it was, and then he refreshed his screen and it was gone for him too. It turns out that it’s a third party “widget” and I have left a cry for help on their site. We’ll see what happens.
I have recently included an index under the search box. It is very incomplete at this point. It is actually a link to post number 0, so if you find I have a glaring omission you can say so in the “comments.” I will try to periodically delete these comments as I address the issues to which they refer.
I want to clarify something. I have shown a lot of different designs since this site started and one might be tempted to think I am just throwing them out there, to see what sticks, or that every design cancels the one before it. One might think that I am inventing and improving “my system.” This is not exactly true. Actually what I have been doing is trying to verify a “best” suspended track design and finalize its dimensions. My reasoning is that while a PRT provider could go out of business and vehicles may come and go, wear out or be improved piece-by-piece, the track will stay until someone tears it down. We cannot know what technologies or configurations will be desirable or employable in, say, 30 years. (Or how the city’s transportation needs might change) We can, however, create a design that is as flexible as possible. This flexibility can include the ability to accommodate different neighborhood types, vehicle weight classes, speeds, special purpose vehicles, propulsion types, and station types, turning radii and slopes, while being easy to construct, deconstruct, and connect to.
I do not think it is altogether coincidental that the two active PRT platforms run on a road-like surface, which can be used for other vehicles if the projects or companies fail. It is simply insurance for the buyer.
Therefore one of my aims is to provide a track profile that is not entirely incompatible with the various PRT technologies available. I would like to see a track that could be readily adapted by one or more PRT venders, so that the track expense does not represent a total financial and political risk. In this respect I diverge from most would-be providers, who require absolute faith in both their proprietary products and their companies. (Most of which are not scaled for any actual contract) I hate to say it, but this seems extremely naive. Is it any wonder that their proposals don’t carry much currency with those entrusted with the public’s money? We, in America at least, have seen many of our pillars of industry and finance file for bankruptcy in the last couple of years. Do these “companies” actually think that they can scale up to manufacture vehicles, lay track, and manage an untried network all at once? More importantly, do they think they can sell that scenario? There’s a clock named after this kind of optimism.
My approach, again, (43% of this site’s readers sample as new, so I repeat myself with purpose) is this. Standardize the basics. Document consensus. Establish common ground.
Where do the companies promoting bottom-supported PRT fit in with all of this? It is my intention to eventually examine these systems as well, with an eye toward addressing any major shortfalls constructively. (Readers will note that in Post 48 I suggested a way to double the throughput of a small-footprint elevated station for almost no additional expense, for example).
A common pitfall in design stems from starting with a set of assumptions and continuing from there. The more you invest in those initial design assumptions, the less likely you are to consider that, perhaps, you were wrong in the first place. I have invested a good deal of time exploring suspended systems, and almost none with the supported designs. Perhaps my original objections can be easily addressed. How can one tell without actually going back to square one?
Finally, there are a couple of obvious flaws in the classification system I suggested last week. One is the use of the letter “x” for both spacers and to mean “Does not apply.” A minus sign would be seem to be a good alternative. Also, (as pointed out by an alert reader) the term “articulation” is not self-explanatory. It does indeed refer to tilting the cabin with respect to the track to adjust for slopes and curves. Pitch and Roll are aviation terms. In the system I did not allow space for both Pitch AND Roll articulation. This, as you can see, is a work in progress.
Saturday, July 11, 2009
41> The Future Revealed!

I have been slipping into the fringe… That’s right, out of the main stream, into the ranks of the eccentric, into the world of the worshipers of the untried and untested… Beware!
I am thinking the unorthodox, have thought the unorthodox, and am beginning to believe! (Scary music and goose bumps ensue)
“What is this unholy philosophy?” you ask…trembling..
“It is this.”
“PRT can and should behave like ordinary traffic. Like ordinary drivers. It should react to the open road like a kid on spring break, unless, of course, Grandma’s on board. Slow traffic should stick to the slow lanes, stay off the highways.”
“No, wait ... Not independent drivers…”(the author closes his eyes as if communing with the great beyond) “Starlings! Schools of fish! Yes, That’s it! Traffic should behave communally. Like drivers who can read each other’s minds, and create ad hoc teams to punch through traffic, like a bubble in a witches brew…”
Think about it. Right now, the prevailing methodology is to slow the whole system down so that a vulnerable few don’t get frightened or motion sick. Everyone else has to take a little longer to get there. I understand that safety is a huge issue. Yet millions are being spent to research ordinary cars “driving by wire” as it is sometimes called. Now I might be a little crazy, but that’s nuts. Speed and switching control while captive in a rail is one thing, but turning your car over, on a real, 3D freeway to a computer is something way higher on the “crazy scale”. Or perhaps not… Modern passenger planes can take off and land unassisted, so what is the big deal?
The possibilities and ramifications are many to this philosophy. For example, passengers can be screened for speed preferences before boarding, or can have their personal preferences set upon creating an account. Now say, for example, 1st and 2nd avenues run North-South, and there are multiple PRT vehicles approaching the area, seeking North-South passage. Why not create a temporary fast and slow lane to accommodate those passenger preferences? Let the speed demons take 1st and the slowpokes take 2nd. This particular arrangement can dissolve as fast as it was created, while circumstances create other opportunities to snake through congested areas.
This obviously takes a much, much higher order of complexity in software control than the ordinary systems that have been developed so far. It is equally obvious that this approach is the future of PRT control, enabling the most efficient use of any given track infrastructure.
The author opens his eyes, séance complete, future revealed! (Wink wink.) You heard it here first, folks… ;o)
All kidding aside, there has been a shift away from centralized control in a variety of communication and control architectures in recent years, as individual “nodes” become endowed with greater and greater processing power. As for PRT, the original concept was to have a fleet of vehicles moving at exactly the same speed. Merges within congested areas would be accomplished by only slight speed changes, or presumably the merge would be called off. The claim of “non-stop” travel was a bit disingenuous, because the trip was to only begin once there was space on the track. In other words, the waiting would be done at the station instead of on route. Now the question is how, with every PRT “pod” having redundant Pentium class processors, can that computing power be employed to prevent traffic congestion in the first place? Although this may all seem very far down the road, I think it does have some bearing on the physical systems, including optimal track layout, station design, and vehicle capabilities.