Showing posts with label PAT. Show all posts
Showing posts with label PAT. Show all posts

Saturday, February 9, 2013

152> Standardizing for the Future



When I first started this blog, I did so with the conviction that what PRT needed was some sort of standardization – a way to allow PRT to be a joint venture between specialized companies doing what they do best, instead of some little startup trying to be ten companies at once.  That way a depth of resources could be brought to play that could never be matched by any other method, except, perhaps, direct government subsidies. 

Times have changed and things are changing faster by the minute.  This was spelled out to me, yet again, as I was writing my last post on forward-compatibility and extensibility.  In that post I outlined a “last mile” strategy, and it involved slower, bare-bones loops within loops – almost like big long circular driveways.  This represents an important call… A call for a plurality of speeds. (I have called for high speed routes as well.)  This requires a degree of control complexity that seemed pretty far-fetched just a couple of years ago. 

A related topic involves vehicle size. Many see the utility of using the track for other purposes beside strictly passenger service. Freight could be delivered, for example, straight into buildings and even into offices or down store isles with vehicles specifically designed for the task. Many will also agree that there might be some cases when passenger vehicles of differing sizes would be appropriate. That means that these two qualities (multi-speed and multi-sized) would require a track that would support such configurations. A system designed to be forward-compatible and extensible into the relatively distant future should, therefore, ideally incorporate such possibilities in a current track design, even if such features are not part of the current system iteration.

One problem with getting the most out of the infrastructure that this track represents is the question of ownership and maintenance.  Back in the day, PRT was thought of as one big machine, presumably operated by a specialized team stationed at the terminals of some giant mainframe.  Now, with distributed computing, cloud based sharing, dirt cheap sensors and the rest, there is real question as to how much will really need to be done centrally.  After all, if you give Google’s automated cars their own lane and program them to pick you up, taxi-style, haven’t you just created a PRT system that is essentially like ULTra?  The key point, it seems to me, is vehicle autonomy.  If positionally-aware, constantly communicating vehicles can take current traffic data and pick (and report) their own routes, and they can be made to establish safe headways and merge safely, then managing the system would potentially be much simpler than what is currently done by law enforcement for our roadways.  Taking the intelligence out of the track, it appears, has benefits.  Is “dumb” track the most forward-compatible and extensible choice?  Quite likely, I think.  It is also cheaper and therefore more extendible in terms of coverage, and is less “breakable” as a system.  Thank goodness for technological advances!

 It may even be the case that it is easier to get through regulation hurdles with autonomous vehicles on dumb track.  After all, it’s hard to argue that a tracked environment is somehow more dangerous than the unpredictability and traction-dependence of city streets, where driverless automobiles would go.  Also the specter (or assumption) of larger, multi-passenger vehicles seem absent from the safety discussions at present.  I don’t believe Google’s robocars have had to pass any APM (Automated People Mover) standards and they certainly haven’t been subject to the arcane rules designed for trains, something that has been of arguable concern in PRT circles.

Let’s bring standards back into the discussion.  As I said in the opening, I have long been an advocate of open-source standards for PRT, so that a system can be made by a multiplicity of specialized companies. But I am also very wary of setting standards too soon, as they could rope the whole effort into one that favors an inferior design or soon-to-be obsolete technology.  One important reason to establish them, though, has to do with the PRT business model.

From a point of view of doing the most for society and the wellbeing of the planet, the best model would be for the track to be open to all qualified vehicles…any and all meeting certain standards.  There is every reason to want to take as many vehicles off of the roads as possible, and so there is good reason to make the track as versatile as possible in that regard.  This brings us right back to extensibility and forward compatibility.  Note that I said “model” and not “business model.”  From the “PRT business” point of view, designing for the distant future makes no sense.  Any PRT startup has no choice but to begin in the least complicated way possible.  In terms of overall long-term business growth, though, it makes great sense.  What is good for society and the planet also unleashes all sorts of potential business models that cannot exist today.  Maybe tiny delivery “bots” will bring you your pizza.  Wouldn’t that beat the current paradigm of using a person, fossil fuel, and a multi-ton vehicle to do the job?   The point is that extensibility and forward-compatibility are only useful to a business insofar as they relate to their best financial interest in the relatively near future, and therefore their designs will reflect this, even if those designs do not reflect the best interest of the environment, traffic mitigation, or other such benefits. 

I envision a business model where a PRT company serves as a general contractor and business partner with a city, but whose role gradually diminishes with time.  In such a scenario the revenue stream and responsibilities gradually shift to the city, although obviously the PRT company could always be kept on for whatever role is agreed upon.  The important point here is that the PRT company’s exclusive rights to the track should have an endpoint.  This would seem attractive to the city, since it does not have to grant never-ending monopoly status to a company that may or may not live up to expectations.

This is where design extensibility and forward-compatibility meet open standards, business viability, as well as societal and ecological priorities.  Although it makes no sense for a PRT provider to design a track that can, someday, more efficiently deliver pizza, mail or bags of cement, it makes more sense to the eventual owner, the city.  The city’s needs are much more closely attuned those environmental, societal and macro-economic problems that PRT has such great potential to solve.

This mismatch between a PRT provider’s needs and a city’s needs directly influence the desirability of PRT as a meaningful alternative to other transportation solutions.  If PRT is to represent a prudent investment in the future, there should never be a possibility of having to scrap miles of track because of aging vehicles or an obsolete operating system, or a bankrupt PRT company.  Every component should be able to be updated – forever.  Perhaps this is why, although rail-type PRT offers numerous advantages over pavement based systems, it is the latter that is making the most inroads.  An elevated mini-roadway may not be what I would prefer to have going down my street but it is clearly an extensible choice.  It could be used for bicycles, scooters, golf carts, pedestrians, manned electric taxis, whatever.  This represents a safer investment for city planners, even as it caps routing choices and speeds.

A standardized PRT platform that is easily adapted and upgraded would similarly represent a safer choice, if the various parts of the system were sufficiently simple.  The owners (the city) should preferably have a system where they could simply take bids for repair, replacement, expansion, etc.  The main danger is that such a standard will be a bad one.

It seems to me that building a good standard should be a lot like building a sound structure…  Start with a sure foundation.  This can start with a wish-list.  The two listed above - to allow multiple speeds and multiple vehicle types, are neither required nor advantageous in early iterations, and so without the altruistic guidance of forward-looking standards such qualities could take many decades to see the light of day.  The same could be said of multi-axis capabilities, guideways that can carry street lighting and utilities, and other qualities that might be on our list.  But if we really want PRT to make a dent in the miserably obsolete transportation status quo, we need to look far ahead and plot a course.

Standards can be very exact and legally precise or vague but definitional - a “standard” putter, for instance.  The latter, consensus-driven definition always precedes anything more exact, and there is not a great deal of consensus on PRT design.  But what can we generally agree on in terms of PRT’s eventual role?  About the objectives that are important to the environment, the society, the economy, etc.?  What qualities will create the potential for a pervasive system?  What qualities will eventually permit the most efficient management of the system?

Extensibility and forward-compatibility are vitally important, even in the areas of ownership, management, societal benefit, etc.  These factors can influence choices that foster the widespread proliferation of PRT or keep it as a fringe technology that only benefits a few.  I advocate going beyond the narrow scope of practical first steps, and into a broader discussion of all of the qualities that are needed for ideal future terrestrial transportation so that we may better steer in that direction.  The priorities of such a hypothetical system are surely different than those of systems that are being promoted as already set for deployment.  Still it is an exercise that we need to do, especially since what is being offered is finding such tepid acceptance. 

Saturday, November 24, 2012

148> Off-the-Shelf PRT




I was thinking, the other day, about this blog and how badly it needs a facelift, and I had a realization.  The original purpose of the site has essentially been realized.  No, I did not succeed in getting a cadre of engineers to anoint and consecrate a set of standardized dimensions under the alter of “open source.”  Nonetheless these last few posts represent what is pretty much the closing of a chapter, design-wise.  After a rather exhaustive assessment of a variety of issues, it can be said, in most instances, that there is a clear, best way to accomplish a system with the kind of capabilities I have been advocating.  I had originally hoped to create some standards for PRT, so that the business would not require a single company to be the expert in vehicle making, station building, track building, route planning , system maintenance, traffic management software, etc., etc.  What we have, actually, is a pretty good start in that direction, at least for this one type of PRT.  In my last post I outlined a bunch of “pearls of wisdom” that, if followed, outline how the capabilities of a suspended PRT system may be greatly extended.
These principles guide track design and therefore bogie design.  Since there is nobody else really trying to push the performance envelope for suspended systems, I guess I’m sort of creating the basis for such standards as I go.  What I am advocating is an open standards approach to what I call a “SMART” network. (Suspended Multi-axis Automated Rail Transport) My vision is to create the cheapest, fastest, least intrusive, most versatile, method for “air-lifting” a load from any point A to any point B without actually flying.   

At some time in the near future, this site will no longer be about getting recruits to design a better PRT system, but rather about refining and promoting those design decisions that resulted from the work already posted.  It took a very long time to do, and there are still plenty of details to nail down, but longtime readers of this site have seen the other parts of this system and know that the current work on the bogie is akin to shaping a keystone – the final piece that must fit in an arrangement of pieces that have been fashioned just for it.  Once the essential geometry is set, and the capabilities and limitations are known, it’s detail time… time to design a prototype in earnest.  Once again, my apologies to anyone who has just found this site.  I’m sure this bogie (which doesn’t even show hardware for hanging a vehicle) must be mystifying.  I will soon put the pieces together into a unified system. I promise! 




Not that there isn’t a LOT more work to be done here, on this model.  Each piece needs to be examined for redundancies, interferences, extra weight and manufacturability.  This will take days or weeks, not hours.  Still, I think the general design demonstrates that, with the right geometry, extraordinary capabilities can be achieved with a modicum of inexpensive parts.  I have had to sacrifice almost nothing in terms of speed, turning radius or climbing, which are over 100 mph, under six feet, and any angle up to 90 degrees, (straight up) respectively.

One thing that is lacking in many PRT and dual mode proposals is a practical way forward.  Often concepts are presented that are so early in the research and development stage that only a physicist can tell if they are even feasible, let alone lucrative.  Although parts of any complex machine become more specialized over time, presenting it with too many of these one-of-a-kind components too early tends to condemn an otherwise good concept to a life on the drawing board.  Since business realities demand that commercial incentive surpasses developmental risk, a budget oriented “proof of concept” design is an invaluable first step. 

 



With this in mind, this bogie design (which is a more evolved embodiment of the ideas expressed in the last post) uses “off-the-shelf” components where possible.  The motors for this model are dimensioned from the 7000 watt hub motors from Kelly Controls.  Using four adds up to a bit over 39 hp.  The upper steering guide wheels are hub motor driven scooter wheels and tires. (13”hubs, from the same source, with Pirelli Diablo tires)  The steering guide wheel is designed for continuous contact and the hub motor can be sized up to 6kw, for an additional 8hp.  Although this would compare favorably with other systems out there, it would still be a bit underpowered for commuting.  Luckily, the main drive wheels are standard low profile automobile hubs and tires (215/35-18) and so the motors can be readily swapped with higher power ones, even up to the monster (80hp per wheel) Protean motors, which would enable performance that would put most sports cars to shame.  For climbing standard sprockets are used, drilled for lug nut extensions.  The design features truck style emergency air brakes that clamp the track.  There are dual (self-diagnostic enabled) steering guide servos that work together but can work singly as long as there is power from either the track or the onboard battery.

In this design the steering guide wheels are not on rocker arms, like in the earlier design.  Although the rocker design does seem to offer smoother engagement, this supposed advantage assumes a continuous rail to engage upon.  If the steering guide wheels are positioned first, with the contact rails being tapered to make contact after that, this is smoother still.

About the upper steering guide wheels: First, the matter of wear.  After all, they are soft rubber, relatively small, constantly engaged, and contacting at an angle.  I would first note that tires for scooters and other two wheeled vehicles have heavy sidewalls so that riders can lean into turns, which is an extreme torture test compared to pushing into the smooth steel of the “diamond” guides.  With the new (counter-rotating) lower guide wheel geometry and wider drive wheels the forces exerted on the upper wheels is minimal.  Also, engagement between the wheel and guides need not be continuous, or at least not under significant pressure.  I envision the contact being primarily on the crown of the tire most of time but, unlike scooter use, there is no driver, second rider, or vehicle weight on them.  A good finished design will enable the whole wheel to be swapped so that the tires can be changed on a bench instead of on the vehicle. Lastly, the tires are relatively cheap and specialized wheels will eventually evolve.  These should be good for well over ten thousand miles as they are.   All tires should probably have ribbed or foam reinforcement inserts, giving them the ability to run properly even if deflated.  After all, tires are hollow primarily as a cushion against uneven road surfaces, which, of course, does not apply here.

About the emergency brakes – This aspect has had the least amount of thought at this point, but I wanted to explore where the hardware would fit, so I put a crude system in place.  The idea is that the lower brake shoes engage first, pulling the bogie into the track and compressing the tires a bit before the upper shoes make contact.  We don’t want to have the brakes make the tires lose traction. The brakes are spring activated, and disengaged by compressed air.  Another concern is clamping only on one or the other side of the track on switches.  As it stands, such a one-sided drag might tend to pull the bogie off course.  I am still mulling that one over.  The geometry enables some kind of bumper activated system and/or a passenger activated one well.

I know it is very difficult to understand a system from a few pictures, but there is only so much that is worthwhile to show at this point.  An exploded view would be helpful, but most of the parts will still be evolving for a while yet.  Another issue to consider is that the ordinary way such parts are made on an industrial scale is by punching and stamping.  These processes are used to cut out a shape from metal sheet and form it into a 3D shape, which stiffens it in the prescribed manner.  This requires huge machines and matching heavy steel male and female surfaces to squeeze the plate between, often at high temperatures.  Such a process is impractical for small scale production, so we are left with making everything out of plate and profiled stock, such as tubing or angle steel.  This compromises proportions and weight tremendously, and is one reason why I think that such manufacturing should be separate from the PRT business per se.  In any case, any designs herein will be constrained by processes that can be done on a small scale, often by hand, but hopefully with shapes also suitable for mass production.  I can say from experience that, at a certain point, it is better to simply start making the thing, because the prints inevitably prove themselves short-sighted, and every change creates a ripple effect.

Well, that’s it for now, but for this closing thought.  On Thanksgiving morning, on I-10, (the principle southern road across the US) there was a massive pile-up due to fog.  Over a hundred cars and trucks were involved, scores were injured and two died.  The highway was closed for nine hours.  This is a system that seems unworthy of the times, if you ask me.  We live in a world awash in cheap sensors and amazing computing power. Yet all of that heavy machinery was being controlled by people blinded by fog and in too much of a hurry to slow down.  This is a systemic problem that needs a systemic solution. We need an app for that!